Highly secure transaction data room

for the experts Pölsterl, von Glasenapp Partner mbB, Company for Real Estate Valuation

TRANSACTION DATA ROOM
Transaction type

>5 YEARS
Operational time


Challenge
Lively exchange of files with simultaneously great communication needs between client and contractor.

Solution
Audit-proof implementation and logging of the entire communication and document traffic.

Briefly about the client

The independent expert office prepares neutral and impartial reports. The focus is on the valuation of investment properties for institutional customers as well as investment properties and residential properties for private individuals. Depending on the reason for the valuation, a market value appraisal or a market and mortgage lending value appraisal is prepared.

Why did the property valuation company choose PMG?

That is why DYVE.

A data room offers many practical advantages. In addition to efficient and transparent business processes, the data room must meet the highest security guidelines. “The task entails a lively exchange of files (sometimes with a very large volume of data). At the same time, there is a great need for communication between the client and the contractor. For everyone involved in the project, it is important to see at any time who has received which information and when, or when which documents have been sent from client to contractor or vice versa,” says Mr. von Glasenapp. DYVE offers an audit-proof exchange of sensitive documents, exactly who received and processed which documents and when is logged.

Q&A. Workflows. Structure.

The Q&A module and individual workflows contribute to the efficient processing and creation of analyzes, evaluations and transactions. The due diligence process runs faster because certain documents are automatically assigned to the correct contact person for review.

With many folders, a clear structure is essential. Thanks to the AI, DYVE is able to automatically assign documents to the correct folders. With configurable groups, categories and rights, users can be precisely divided and only see the documents that are relevant to them. Different release levels can also be set up for sensitive files.

Highest security level.

“We are currently working on a large project in which we have to prepare a market value appraisal for a public property owner for 66 mixed-use properties across Germany. The project runs for at least 1 year. Afterwards there will probably be re-evaluations for a further four years”, says Mr. von Glasenapp. The due diligence and transaction of sensitive data requires strict security guidelines and encryption. DYVE offers highly secure access and all data is stored in certified data centers in Germany.

„It is very easy to use and can be safely mastered by anyone, even in hectic situations, e.g. during a telephone conference with the client. DYVE is ideally suited for our analyzes, evaluations and transactions.“

Dipl.-Ing. Maximilian von Glasenapp
Experts Pölsterl, von Glasenapp Partner mbB, Company for Real Estate Valuation

Other DYVE Case Studies

Highly secure data room for ZF Friedrichshafen

“With the data hosting in German data centers, the individual assignment of user rights and the changeable process settings, the PMG data room can be optimally used for our M&A matters”

Barbara Blumenstock
M&A Cooperation ZF Friedrichshafen AG

Highly secure data exchange for Elystan Capital Partners GmbH

“It was crucial for us to set up the data room with all the documents as quickly as possible in order to enable potential buyers to start the due diligence promptly. We were able to start within three days.”

Olaf Schlüter
Managing Partner at Elystan Capital Partners GmbH

Highly secure data exchange for SHI Management GmbH

“PMG offered us the greatest flexibility and was so self-explanatory that we could involve external parties without any problems. In addition, PMG convinced us with its attractive price-performance ratio.”

Gabriele Escher
Head of Asset Management at SHI Management GmbH

Highly secure data room

for ZF Friedrichshafen

TRANSACTION DATA ROOM
Transaction type

12 - 24 MONTHS
Operatinal time


Challenge
Handling of tenders with several buyers and careful and trouble-free handling of the Q&A processes.

Solution
Audit-proof implementation and logging of the Q&A process.

Briefly about the client

ZF is a leading global technology group in driveline and chassis technology as well as active and passive safety technology. With around 146,000 employees and 230 locations in almost 40 countries, ZF is one of the world’s largest automotive suppliers.

The company spends more than six percent of its sales on research and development every year, primarily on efficient and electric drives and a world without accidents. With its extensive portfolio, ZF improves mobility and services not only for passenger cars, but also for commercial vehicles and industrial technology applications.

Why did ZF Friedrichshafen AG choose PMG?

In addition to the many practical advantages of a virtual data room, such as the efficiency and transparency of processes, the outsourcing of sensitive company data must also withstand a sufficient security concept. In M&amp;A processes, the highest level of transaction security is the most important thing, and that without exception. PMG was subjected to a comprehensive company analysis before the transaction data room was used. ZF Friedrichshafen’s in-house IT department put PMG through its paces to make sure that all safety requirements were met. With success – because no other provider on the market was able to serve the required level as extensively as PMG. <em>“It is precisely because the hosting and support of the software at PMG takes place exclusively in Germany that the cooperation is so attractive for us,”</em> says Barbara Blumenstock, responsible for M&amp;A cooperation at ZF Friedrichshafen AG, <em>“because data protection and compliance are important to our transactions highest priority.”</em>

Q&amp;A. Individual workflows.

One of the central challenges of ZF Friedrichshafen AG before using the PMG data room was the Q&amp;A processes in previous projects. Among other things, tenders with several buyers have to be dealt with. The PMG Q&amp;A module provides audit-proof and transparent support for virtual question-and-answer processes in order to support efficient due diligence. With the Q&amp;A module, all parties ask and answer public and private questions. With the bidder management function, ZF Friedrichshafen can define the respective rights of the individual involved via freely configurable groups and categories. The users can then be combined to form a group of bidders. This process is controlled with any number of release levels.

HSM (hardware security module). Highest level of security.

Communication between management boards and supervisory boards in sensitive transactions requires strict compliance regulations for the management of confidential documents. PMG offers ZF Friedrichshafen an HSM (Hardware Security Module); a storage location for cryptographic keys that are used, for example, to encrypt customer data. In the highest security level, the project masterkey is stored in an external HSM. In addition, it is encrypted with the passwords of the assigned users. General access by a system administrator is therefore excluded. The HSM uses extended technical measures to protect the keys from unauthorized access and data rooms can then only be maintained by administrators who are also assigned to the project. “Our requirement was that we could manage the encryption and decryption of customer data ourselves on our own systems or under our own control. PMG offered us an “on-premise” solution. This is very straightforward for us and ensures that we never have to give the keys out of our hands. An additional safety criterion that we get met by PMG,” explains Barbara Blumenstock from ZF Friedrichshafen.

„The collaboration with PMG was very cooperative. Our wishes and requirements were dealt with individually. With data hosting in German data centers, the individual assignment of user rights and the changeable process settings, the PMG data room can be used optimally for our M&amp;A matters.“

Barbara Blumenstock
M&amp;A Cooperation ZF Friedrichshafen AG

Other DYVE case studies

Data room for the experts Pölsterl, von Glasenapp Partner mbB

“On the one hand, the data room created a clear overview and, on the other hand, enabled the project to be fully organized.”

Dipl.-Ing. Maximilian von Glasenapp
Experts Pölsterl, von Glasenapp Partner mbB, Company for Real Estate Valuation

Highly secure data exchange for Elystan Capital Partners GmbH

“It was crucial for us to set up the data room with all the documents as quickly as possible in order to enable potential buyers to start the due diligence promptly. We were able to start within three days.”

Olaf Schlüter
Managing Partner at Elystan Capital Partners GmbH

Highly secure data exchange for SHI Management GmbH

“PMG offered us the greatest flexibility and was so self-explanatory that we could involve external parties without any problems. In addition, PMG convinced us with its attractive price-performance ratio.”

Gabriele Escher
Head of Asset Management at SHI Management GmbH

City Quarter
MAIN YARD Frankfurt a. M.

Project development of the ORT Group

approx. 55.000 sqm
Building area

approx. 19.000 sqm
Living space

2021 - 2025
Running time

50 Project participants
Project participants


Challenge
Central platform for information exchange and central plan and document storage.

Solution
PAVE for plan, document and communication management. Simple, fast and secure exchange between all project participants.

The concept

In Frankfurt’s Allerheiligenviertel district, the sustainable and ecological MAIN YARD urban quarter is being built between Breite Gasse and Lange Straße. By 2025, around 19,000 sqm of residential space, contemporary gastronomy and retail areas, a design hotel and a two-story underground parking garage with approx. 170 parking spaces, some of which are public, are planned here.

green alley GmbH is the project company realizing the MAIN YARD project. Behind it is the ORT Group with headquarters in Frankfurt a. M. and Munich.

PAVE requirements

For the control of the construction project, the main focus is on plan and document management as well as communication for simple, fast and secure exchange between all project participants. PAVE offers a clear and intuitive interface. All parties involved are always up to date, so there are no conflicts due to outdated documents on the construction site.

“PAVE is used primarily during the planning and construction phases. By collaborating digitally on a central platform, we shorten processing times and ensure that the project is handled effectively,” says Rafael Boßler, ORT Group.

Why PMG

“We have high expectations of our partners in terms of data security and data protection. PMG meets all the requirements here. It was also important for us that we could continue to use the data room as an archive with complete project documentation after the project was completed,” continues Rafael Boßler.

The ORT Group has control over all information at all times and manages the document structure with the corresponding directory and access rights. Short information and decision-making paths between the general contractor, the client, project management and control, and the individual trades are a major advantage and ensure an efficient process.

CITY QUARTER MAIN YARD

A NEW TOGETHER

A neighborhood that had fallen into oblivion in Frankfurt’s prime downtown location is finally being given its due with the MAIN YARD. A place is being created here that will change and enrich the entire neighborhood. An inspiring mix of retail, gastronomy, hotel, serviced apartments and apartments that will give the city new living space and a new zest for life. With a green soul, an alert mind and a big heart, the MAIN YARD is becoming the center of contemporary urban togetherness. And thinks of the environment. Thus, the MAIN YARD becomes the source of a new togetherness.

THE SUSTAINABLE DISTRICT

Sustainability has a high priority at MAIN YARD. Yet the topic is complex and multi-layered when it comes to concretizing individual measures. Connecting people and places in an intelligent, environmentally friendly and sustainable way is one of the main goals. To this end, the dedicated Thinking Workshop was set up at the ORT Group office location in Frankfurt a. M., where an active exchange of ideas regularly takes place between all project participants – from architects, planners and consultants to representatives of the city and the immediate neighborhood.

„The PAVE project room enables all project participants to exchange all information securely, quickly and easily during the planning and construction phase. Thanks to digital collaboration, everyone is always up to date. Workflows are optimized and processing times are shortened.“

Rafael Boßler
Project Manager ORT Group

Other PAVE Case Studies

30 successful construction projects with PAVE

„Perfection is achieved, not when there is nothing more to add, but when there is nothing left to take away [Antoine de Saint-Exupery].”

Eric Fellmann
Head of construction project management experts at SWM GmbH

A project room for the Premier Inn Leipzig

“The biggest challenge in this project was project management. In PAVE, we had an overview of plans, schedules and costs. This way, efficiency and quality go hand in hand.”

Neset Uguzoglu

Project Manager at Premier Inn Holding GmbH

 

Intelligent modules “Made in Germany” for Implenia AG

„The more people are involved in a project, the more sensible it is to rely on a project room. I recommend PMG’s project room to our customers.“

Andreas Tiedtke
Branch manager at Implenia

Highly secure data exchange

for Elystan Capital Partners GmbH

PMG Elystan Website

TEMPORARY DATA ROOM
Transaktionstyp

DUE DILIGENCE
Transaction type


Type of transaction


Challenge
Fast setup of a data room.

Solution
The CDS & PMG group scanned the documents and uploaded them directly to the PMG project room.

About the customer

Elystan Capital Partners GmbH focuses its business activities on the purchase of office and commercial real estate with added value potential.

The aim is to reposition the buildings by Elystan modernizing them and developing new, sustainable usage concepts.

Why did Elystan Capital Partners GmbH choose PMG?

Data room and scan from a single source

Elystan intended to sell a property with over 100 tenants and a gross floor area of ​​44,000 sqm to a private equity investor as part of an off-market transaction. In preparation for the due diligence, Olaf Schlüter, Managing Partner of Elystan, looked for suitable service providers for scan and data room services.

Through a recommendation, he got in touch with Mike Riegler, managing director of the PMG and CDS group. Mike Riegler advised him on a complete solution for scanning and providing the data via a data room. “It was crucial for us to set up the data room with all the documents as quickly as possible in order to enable potential buyers to start the due diligence promptly,” reported Olaf Schlüter. “In cooperation with CDS, PMG has provided us with the best complete solution for data room and scanning. We were able to start within three days.”

The scanning process

Elystan had already prepared the necessary documents for the transaction and indexed them using tabs. The CDS scan team digitized around 60 folders within 3 days. The documents to be scanned also included large-format blueprints. Each document was categorized according to the index points. CDS then passed the data on to PMG for upload to the data room.

Mike Riegler advised Elystan on setting up and creating the folder structure for the due diligence process. PMG employees then uploaded the scanned documents directly to the folder structure in the PMG data room. “PMG accompanied us through the entire process of setting up the data room,” explained Olaf Schlüter. “This enabled us to set up the data room quickly without using up too many resources internally.”

Due Diligence

A total of around 70 users from eight participating companies accessed the documents in the data room. They included the buyer as well as his advisors and service providers. On the seller side, legal and tax advisors used the data room in addition to Elystan. Olaf Schlüter uploaded additional documents requested by the buyer using the drag-and-drop upload of the PMG data room. He informed everyone about a new file by email. The attached download link led directly to the corresponding document. The buyers were spared laborious searching for the information.

Flexible solution

In the course of the transaction, both parties decided that the property company should also be included in the due diligence. To prepare for the share deal, PMG’s support team worked with Elystan to revise the folder structure of the data room. “All changes were implemented immediately and professionally,” confirmed Olaf Schlüter.

Q&A

The Q&A module of the PMG data room enables the audit-proof management and control of questions and answers during due diligence. The process can be structured using any number of stages. It is also possible to link questions and answers with individual documents. The workflow for Elystan was configured as follows: Every user on the buyer side could ask questions using the form of the Q&A module. Olaf Schlüter took the questions from the seller. He checked them and passed them on to his specialists for an answer. He checked and processed their answers before making them available to the other side. The Q&A module also enables questions to be linked to documents. “If you refer to a specific document for questions and answers, we make communication extremely easy during the due diligence process,” said Olaf Schlüter.

Data transfer

After the successful completion of the due diligence, all data was transferred to a data carrier by PMG. This also contains all questions and answers as well as the logs of the data room activities. The data carrier is part of the contract documents for the sale.

„It was crucial for us to set up the data room with all the documents as quickly as possible in order to enable potential buyers to start the due diligence promptly. In cooperation with CDS, PMG has provided us with the best complete solution for data room and scanning. We were able to start within three days.“

Olaf Schlüter
Managing Partner at Elystan Capital Partners GmbH

Other DYVE case studies

Data room for the experts Pölsterl, von Glasenapp Partner mbB

“On the one hand, the data room created a clear overview and, on the other hand, enabled the project to be fully organized.”

Dipl.-Ing. Maximilian von Glasenapp
Experts Pölsterl, von Glasenapp Partner mbB, Company for Real Estate Valuation

Highly secure data room for ZF Friedrichshafen

“With the data hosting in German data centers, the individual assignment of user rights and the changeable process settings, the PMG data room can be optimally used for our M&A matters”

Barbara Blumenstock
M&A Cooperation ZF Friedrichshafen AG

Highly secure data exchange for SHI Management GmbH

“PMG offered us the greatest flexibility and was so self-explanatory that we could involve external parties without any problems. In addition, PMG convinced us with its attractive price-performance ratio.”

Gabriele Escher
Head of Asset Management at SHI Management GmbH

30 successful construction projects with PAVE

For Stadtwerke München GmbH

From 10 to 200 million euros
Project volume

50,000 sqm
Building area

4-5 years depending on the project
Running time

Depending on the size of the project, 50-200
Project participants


Challenge
Simple, structured and secure exchange of plans and documents of any file size as well as communication between all project participants.

Solution
With PAVE, all documents are up-to-date, errors are minimized and collaboration is optimized.

About the client

Stadtwerke München takes on responsibility in many areas of the city and creates space for living and working, both directly and indirectly. Around 10 years ago, SWM was looking for a partner who offers a cloud-based application to structure and simplify communication with all planners and companies. Since then, a total of 30 construction projects in the order of magnitude of 10 – 200 million euros and between 50 – 200 project participants have been successfully carried out with the PMG project room.

Requirements for PAVE

Usually, the project room is set up at the beginning of the first planning phase. Timely setup and document filling is important here. The team of PMG supports you from day 1 and can be reached quickly. For an effective collaboration, an individual document and folder structure, including a plan key and file name convention, was developed together with SWM. The reporting ensures transparency during the entire project duration, which precisely documents who received which documents and plans with which status and when.

Why PMG

“The PMG project room contains exactly those functions that we need for our projects, which means that the platform remains clear and is very easy and intuitive to use – after all, we attached great importance to this,” said Mr. Fellmann. 10 years ago, SWM took an important step in the direction of digitization of communication and data exchange and will continuously expand the range of functions used for its projects based on the positive experience. In addition, the repro service provider CDS, which is directly connected to PAVE, ensures transparent and time-saving commercial processing.

2 OF THE 30 SUCCESSFUL CONSTRUCTION PROJECTS SHORTLY PRESENTED

IT CITY HALL MUNICH

As the “cerebrum” of the city, Munich’s IT town hall bundles the information and telecommunications technology of the city administration with around 650 employees. In addition to a service center with two office buildings, a new computing and printing center was built. As a client, Stadtwerke München is relying on sustainability and synergies for the complex near the Olympic Park. The new buildings expand the M-Campus technology park in Moosach, an important Munich IT location. The middle of the technology park is the central campus. The attractively designed open space opens to the east with a view of the Olympic site.

OPERATION CENTER MUNICH-MOOSACH

The uninterrupted passenger growth at the Münchner Verkehrsgesellschaft (MVG) requires a larger depot. That is why MVG is currently preparing three new depot projects together with its parent company SWM, one each for the subway, tram and bus. The most advanced is the “New Moosach Bus Depot” project, which is being developed as a “hybrid concept”: The building complex is divided into two areas of use – the bus depot and an urban development with office space for around 900 workplaces and a car park for around 320 parking spaces.

„When selecting the product, we placed particular emphasis on intuitive usability. If users can find their way around without training, this is, in my opinion, a very important factor in creating acceptance among all users. Then they will recognize the advantages of their own accord and will no longer want to do without the service.“

Eric Fellmann
Head of construction project management experts at SWM GmbH

Other PAVE Case Studies

MAIN YARD Frankfurt a. M. ORT Group

„We have high expectations of our partners in terms of data security and data protection. PMG meets all the requirements here.“

Rafael Bossler
Projektmanager ORT Group

A project room for the Premier Inn Leipzig

“The biggest challenge in this project was project management. In PAVE, we had an overview of plans, schedules and costs. This way, efficiency and quality go hand in hand.”

Neset Uguzoglu

Project Manager at Premier Inn Holding GmbH

 

Intelligent modules “Made in Germany” for Implenia AG

„The more people are involved in a project, the more sensible it is to rely on a project room. I recommend PMG’s project room to our customers.“

Andreas Tiedtke
Branch manager at Implenia

A project room for the Premier Inn Leipzig

The perfect project management solution for Premier Inn Holding GmbH

20 MILLION EURO
Construction volume

Approx. 1,400 sqm
Building area

110,000 sqm
Rental space

40 people
Project participants


Challenge
Integration of all project participants such as planners, experts and executing companies as well as the topicality of plans.

Solution
With PAVE, all documents are up-to-date, errors are minimized and collaboration is optimized.

The project

The Premier Inn Hotel the Leipzig train station is the perfect starting point to explore the Saxon cultural city with the opera only a few meters away. In addition, the trade fair is in the immediate vicinity and therefore also interesting for business travelers. The hotel impresses with its modern and stylish furnishings and leaves nothing to be desired. There is even a specially built charging station for electric cars on site.

Requirements for PAVE

For the management of the construction project, the exchange of information, the delivery of plans and the planning control are the main priorities for Premier Inn Holding GmbH. “For the Premier Inn Leipzig project, we need a reliable partner on the digital side for the entire construction process, software for collaboration and the exchange of all data between those involved in the project,” says Neset Uguzoglu, Project Manager at Premier Inn Holding GmbH.

PAVE offers a clear and self-explanatory structure. Everyone involved was always up to date and thanks to the plan index there were no conflicts due to outdated documents on the construction site.

Why PMG

About the advantages at PMG, Mr. Uguzoglu says: “The PAVE project room supports and accompanies project planning and control in an uncomplicated way. The collaboration with PMG was very cooperative and service oriented. Our problems were addressed, and solutions were found quickly. The reliable support team at PMG should also be emphasized. “

Short information and decision-making paths between general contractor, client, project management and control as well as the individual trades are a great advantage and ensure an efficient process. Deadlines, costs and quality could be kept during the entire project phase.

The perfect starting point
to explore the Saxon cultural city

„On recommendation and based on our experience with the construction of the Premier Inn in Munich, we are also handling the Premier Inn project in Leipzig with PMG. You can rely on PMG for the entire duration of the project. The clear structure and ease of use of the project room makes working together a lot easier for us.“

Neset Uguzoglu
Project Manager at Premier Inn Holding GmbH

Other PAVE Case Studies

MAIN YARD Frankfurt a. M. ORT Group

„We have high expectations of our partners in terms of data security and data protection. PMG meets all the requirements here.“

Rafael Bossler
Projektmanager ORT Group

30 successful construction projects with PAVE

„Perfection is achieved, not when there is nothing more to add, but when there is nothing left to take away [Antoine de Saint-Exupery].”

Eric Fellmann
Head of construction project management experts at SWM GmbH

Intelligent modules “Made in Germany” for Implenia AG

„The more people are involved in a project, the more sensible it is to rely on a project room. I recommend PMG’s project room to our customers.“

Andreas Tiedtke
Branch manager at Implenia

Highly secure data exchange

for SHI Management GmbH

SHI PMG website

DUE DILIGENCE
Transaction type

479 FILES / 2.2 GB
Data volume


Challenge
Efficient flow of information during the due diligence.

Solution
Audit-proof exchange of information via the PMG data room.

Briefly about the client

SHI Management GmbH is an independent portfolio and asset manager for institutional investors with a specialist focus on the market for senior real estate.

SHI wanted to sell five nursing homes with a transaction volume of 66.8 million euros for a customer. SHI quickly found a potential buyer and prepared the due diligence. For efficient and transparent communication, SHI therefore decided to use the PMG data room.

Why did SHI Management GmbH choose PMG?

Flexible data room

After evaluating various solutions, SHI decided on the PMG data room. <em>”The PMG data room offered us the greatest flexibility and was so self-explanatory that we could integrate external parties without any problems,”</em> explained Gabriele Escher, Head of Asset Management. <em>”We were also convinced by the attractive price-performance ratio.”</em>

Fast data room setup

PMG created the structure of the data room according to the internal filing structure of SHI, so that the employees quickly found their way around. PMG supported SHI significantly in filling the data room. Some documents, such as blueprints and files from external disks, were digitized or transferred from the CDS. This allowed SHI to concentrate on the negotiations.

German high security data centers

A total of nine participating companies exchanged 479 files with a data volume of 2.2 GB via the PMG platform. As a cloud solution, the investors, lawyers, tax consultants and technicians involved were able to access the data around the clock and from anywhere. These are stored in the German, spatially separated high security centers of PMG. Multi-level security systems including virus scanners protect the files from unauthorized access. The transfer of information is always encrypted.

Automatic notifications

Those involved in the project exchanged data of any size quickly and easily via the PMG data room. If the seller posted a new document, the PMG data room automatically sent an information email with a download link to predefined mailing lists. So everyone was immediately informed about new files and could access them. The granular rights management of the PMG platform ensures that those involved only get access to files for which they are authorized.

Audit-proof logging

For the conclusion of the contract, PMG exported all files and the folder structure of the data room to external data carriers. These disks were part of the contract documents. A complete documentation of all user activities is stored on them. In this way, SHI can prove at any time which files were made available to the buyer. If necessary, SHI could quickly and factually clarify questions about missing information.

Permanent data rooms

After completing the transaction project, SHI decided to set up permanent data rooms for their 45 existing properties. More than 1 million pages with a data volume of 92 GB are currently stored in PMG’s data rooms.

When uploading a new file, the OCR recognition of the PMG data room is automatically given. Desired information is found immediately using a full-text search, even if a document has been stored in the wrong folder. The information is made available quickly and securely to the partners and tenants via information email.

„PMG offered us the greatest flexibility and was so self-explanatory that we could involve external parties without any problems. In addition, PMG convinced us with its attractive price-performance ratio.“

Gabriele Escher
Head of Asset Management at SHI Management GmbH

Other DYVE case studies

Data room for the experts Pölsterl, von Glasenapp Partner mbB

“On the one hand, the data room created a clear overview and, on the other hand, enabled the project to be fully organized.”

Dipl.-Ing. Maximilian von Glasenapp
Experts Pölsterl, von Glasenapp Partner mbB, Company for Real Estate Valuation

Highly secure data room for ZF Friedrichshafen

“With the data hosting in German data centers, the individual assignment of user rights and the changeable process settings, the PMG data room can be optimally used for our M&A matters”

Barbara Blumenstock
M&A Cooperation ZF Friedrichshafen AG

Highly secure data exchange for Elystan Capital Partners GmbH

“It was crucial for us to set up the data room with all the documents as quickly as possible in order to enable potential buyers to start the due diligence promptly. We were able to start within three days.”

Olaf Schlüter
Managing Partner at Elystan Capital Partners GmbH

Intelligent modules „Made in Germany“

for Implenia AG

60 MILLION EURO
Project volume

25,000 FILES / 34 GB
Data volume

37 USERS, 15 COMPANIES
Scope

38,000 sqm
Building area


Challenge
Up-to-date and uniform information for all those involved in the construction.

Solution
The PMG project room supports a transparent and audit-proof flow of information.

Briefly about the client

Implenia AG, formerly Bilfinger Hochbau GmbH, is one of the leading companies in German building construction.

The core competence ranges from order development to planning and turnkey new construction to renovation and inventory optimization of all common types of real estate for private and public clients. In addition, control, operation and logistics complete the offer. On behalf of Kuka AG, Implenia planned and built a new development and technology center in Augsburg.

Why did Implenia AG choose PMG?

Reliable partner

Implenia’s internal guidelines stipulate the use of software for the documented, cross-company provision of construction documents. “The more people are involved in a project, the more sensible it is to rely on a project room,” reported Andreas Tiedtke, branch manager at Implenia AG.

Implenia is one of PMG’s first customers. The company was already a pilot customer at the sister company CDS GmbH and knew it as a reliable partner. When PMG and CDS managing director Mike Riegler presented the PMG project room, Implenia decided in favor of the PMG project room.

Privacy

Implenia’s IT department initially had concerns about data protection, but PMG was able to convince them of its high level of security. For the cloud solution, development, hosting and support take place exclusively in Germany. The data center is ISO 27001 certified. The PMG project room bears the seal of approval “Software Made in Germany” and “Software Hosted in Germany”.

Uniform level of information

Often over 20 people from different departments and branches are already involved in a large project. “We have to ensure that everyone has the same level of information and can access the same data at the same time. That is why we have a uniform data structure for our projects. So everyone can find their way around quickly,” explained Theodor Sprick, Commercial Senior Project Manager at Implenia. Implenia also involved external partners transparently. Project room users could easily upload large files to the project room using the drag-and-drop function or as a ZIP.  “This saves time and money,” said Theodor Sprick happily.

In addition, the PMG project room automatically sent an information email to predefined distribution lists when certain plan types were set. As a result, a uniform and up-to-date information status for all parties was always guaranteed. “The PMG project room is easier to use than other project rooms that I know,” explained Maruan Akil, Technical Junior Project Manager at Implenia AG.

Plan key

In order to keep this large number of files clear, PMG created a directory structure in accordance with Implenia’s wishes. In addition, a plan key helps users to put files in the correct directory. You could only upload files that met the requirements. The project room automatically saved the files in the correct directory based on a name. In addition, users could always clearly identify the most recent file.

Audit-proof logging

The PMG project room recorded all actions in the project room in an audit-proof manner. In this way, Implenia was able to find out at any time which subcontractor had received new information and construction plans.

Archive for warranty period

After the successful completion of a construction project, Implenia used the archive mode of the project room for the warranty phase.

„The more people are involved in a project, the more sensible it is to rely on a project room. I recommend PMG's project room to our customers.“

Andreas Tiedtke
Branch manager at Implenia

Other PAVE Case Studies

MAIN YARD Frankfurt a. M. ORT Group

„We have high expectations of our partners in terms of data security and data protection. PMG meets all the requirements here.“

Rafael Bossler
Projektmanager ORT Group

30 successful construction projects with PAVE

„Perfection is achieved, not when there is nothing more to add, but when there is nothing left to take away [Antoine de Saint-Exupery].”

Eric Fellmann
Head of construction project management experts at SWM GmbH

A project room for the Premier Inn Leipzig

“The biggest challenge in this project was project management. In PAVE, we had an overview of plans, schedules and costs. This way, efficiency and quality go hand in hand.”

Neset Uguzoglu

Project Manager at Premier Inn Holding GmbH

 

Transparent data exchange

for ZIMA Projektentwicklung Deutschland

26,500 sqm
Gross floor area

100 USER
scope

5,000 FILES / 7 GB
Data volume


Challenge
Ensure efficient document exchange between more than 100 project participants.

Solution
The PMG project room enables the fast and transparent exchange of large amounts of data.

Briefly about the client

The Austrian ZIMA group has been realizing real estate projects in the entire Alpine region for over forty years. The subsidiary ZIMA Projektentwicklung Deutschland GmbH & Co. Perlach KG is planning and realizing an exclusive residential complex with 138 condominiums in Munich – the “LAO – Leben am Ostpark”.

Why did ZIMA choose PMG?

Project room wanted

Dieter Stähele, Technical Director at ZIMA Holding AG, was looking for a suitable solution for a transparent exchange of project documents. The KSP Jürgen Engel Architekten GmbH involved in the project advised him to use the project room and recommended the PMG project room. After a market evaluation and presentations from various manufacturers, Dieter Stähele chose the Software-as-a-Service solution from PMG Projektraum Management GmbH. “The PMG project room is uncomplicated, flexible and inexpensive”, Dieter Stähele explains his decision.

Document exchange

ZIMA made the planning and project bases available to all partners involved via the project room. More than 100 people such as client, architect and specialist planner accessed the documents and uploaded their work results. Including, for example, construction plans, contracts, protocols and tender documents. The company defined the folder structure according to its own requirements.

<em>”For an effective use of a project room, it is important at the beginning of the project to specify exactly which intermediate stages and plan statuses are to be set in the project room,” explains Robin Hartig, project developer at ZIMA Projektentwicklung Deutschland GmbH. “Then you exploit the full potential of a project room.”

Up-to-date informations

When a user uploads a new version of a document, the PMG project room automatically archives the previous version and locks it for access. Therefore, only the current document is available to users. In this way, ZIMA prevented errors due to outdated documents.

“If I want to be sure that I am looking at the latest construction plan, I download it from the project room,” confirms Robin Hartig.

Upon request, the PMG project room also automatically sends an information email to a defined mailing list when a new document is uploaded. This ensured that everyone involved in the project was always up to date with the latest information.

Tender

Among other things, ZIMA managed tender documents via the PMG project room. For this purpose, ZIMA stored the documents on the Software-as-a-Service platform. Using the “Send information mail” function, ZIMA also made large amounts of data available to bidders quickly and efficiently via a download link. The bidders could then enter a PIN that they had received in the mail in order to download their documents immediately afterwards.

Documentation

Since ZIMA manages all relevant construction documents in the project room, a cross-company, complete construction documentation was created automatically. These can later be used by the owners and facility management. “We will definitely use the PMG project room again for larger construction projects,” summarizes Robin Hartig.

„With the PMG project room, we can always see who has posted what and when. Change notifications or delays are based on a basis that everyone can understand. That supports transparent communication.“

Robin Hartig
Project developer at ZIMA Projektentwicklung Deutschland GmbH

Other PAVE case studies

MAIN YARD Frankfurt a. M. ORT Group

„We have high expectations of our partners in terms of data security and data protection. PMG meets all the requirements here.“

Rafael Bossler
Projektmanager ORT Group

30 successful construction projects with PAVE

„Perfection is achieved, not when there is nothing more to add, but when there is nothing left to take away [Antoine de Saint-Exupery].”

Eric Fellmann
Head of construction project management experts at SWM GmbH

A project room for the Premier Inn Leipzig

“The biggest challenge in this project was project management. In PAVE, we had an overview of plans, schedules and costs. This way, efficiency and quality go hand in hand.”

Neset Uguzoglu

Project Manager at Premier Inn Holding GmbH

 

High level of e-collaboration

for the GWG München

Sie arbeitet kontinuierlich daran, in der stetig wachsenden Stadt bezahlbaren Wohnraum für die Münchnerinnen und Münchner anzubieten. Hierzu baut die GWG an verschiedenen Standorten in München neue Wohnanlagen. „Die Notwendigkeit, einen Projektraum für eine effiziente Projektraumkommunikation einzusetzen, bestätigt sich bei jedem Bauvorhaben neu“, erklärte Herr Weißenberger, Projektleiter Neubau bei der GWG.

30 million euros
Project volume

2,600 FILES / 6 GB
Data volume

37 USERS / 25 COMPANIES
Scope

151 APARTMENTS / 1 SUPERMARKET
Rental space

6,200 sqm
Gross floor area


Challenge
To make the current working basis available to all specialist planners at all times.

Solution
All those involved in the project exchange cross-company documents at a central point via the PMG project room.

Briefly about the client

GWG Städtische Wohnungsgesellschaft München mbH manages over 27,000 rental apartments and almost 600 commercial units.

They work continuously to offer affordable housing for the people of Munich in the steadily growing city. For this purpose, the GWG is building new residential complexes at various locations in Munich. “The need to use a project room for efficient project communication is confirmed with every construction project,” explained Mr. Weißenberger, project manager for new buildings at GWG.

Why did GWG choose PMG?

Central data storage

For the first construction phase, 25 companies with a total of 37 participants use PMG’s software. Around 2,600 files with a data volume of almost 6 GB are available on the platform. In the planning phase of the second construction phase, around 20 users from ten companies are currently exchanging documents via the PMG platform. The files provided are, among other things, construction plans, expert opinions, permits and protocols, which are checked for completeness by the GWG project management and released for further use by other project participants.

“We save interfaces with a project room. There is only one central place where everyone has to post their work results. So everyone is always up to date,” says Mr. Weißenberger happily. Based on the files set in the project room, the project management can get an up-to-date picture of the planning progress at any time and intervene immediately if necessary.

Transparency

As a project room administrator, Mr. Weißenberger has special rights to manage the project room. He creates new directories himself and sets the access rights to folders and documents for the project members. The GWG has control over the flow of information and the documentation structure it needs. The PMG project room logs every action in the project room in an audit-proof manner. The GWG can therefore track at any time who had what level of information and when. The project room also saves the different versions of a document. In this way, the housing company can clarify at a later point in time who accessed which plan and when.

Basis for management

The apartments on Ackermannbogen will remain in the GWG property and will be managed by them after the building has been completed. Consistent use of the project room for cross-company document exchange results in complete construction documentation. After completion of the project, Mr. Weißenberger hands over a large part of the documents, such as building plans, to his colleagues in Facility Management and Technology. The data form an important basis for the operation of the apartments.

„We save interfaces with a project room. There is only one central place where everyone has to submit their work results. Everyone is up to date. There are no old plans or stands.“

Stephan Weißenberger
Project manager new building at GWG

Other PAVE case studies

MAIN YARD Frankfurt a. M. ORT Group

„We have high expectations of our partners in terms of data security and data protection. PMG meets all the requirements here.“

Rafael Bossler
Projektmanager ORT Group

30 successful construction projects with PAVE

„Perfection is achieved, not when there is nothing more to add, but when there is nothing left to take away [Antoine de Saint-Exupery].”

Eric Fellmann
Head of construction project management experts at SWM GmbH

A project room for the Premier Inn Leipzig

“The biggest challenge in this project was project management. In PAVE, we had an overview of plans, schedules and costs. This way, efficiency and quality go hand in hand.”

Neset Uguzoglu

Project Manager at Premier Inn Holding GmbH